
18,000 sq ft distribution floor, Burnaby
- System
- Epoxy build coats with urethane topcoat
- Downtime
- Three weekends, zero shipping days lost
Two previous quotes ignored a high in-slab humidity reading. We installed a moisture-mitigating primer, armoured every control joint, and phased the coating aisle by aisle so pickers kept working through the week.


